Friday, May 09, 2008

48 Recap

Hard to believe this is our fifth year participating in the 48 Hour Film Project (and our sixth film — what were we thinking doing two films at once in only our second year?). And every time I’m reminded that this really is film school; as far as I’m concerned, we’d better take advantage of that and try something new each time.

So if our big “add-on” last year was bringing in a professional author to write our script (well, and pushing the envelope with noir-styled lighting — no small feat given our meager lighting kit), then this year had a few new elements. We brought in another professional author (Barry Lyga), worked with two great SAG actors (Joe Hansard and Jennifer Massey) as our leads, shot in HDV, and even managed to use a homemade car mount for our “road movie.”

With a lot of our regular troupe (both in front of and behind the camera) unavailable this time around, we’d be a little leaner than usual. But there’s something to be said for keeping things small — and coming right off of “Number One With a Bullet,” we’d honed our workflow pretty well. Of course, the time we’d spent on the earlier shoot also meant we hadn’t prepared as much as usual, so we’d be winging things a bit.

So, about the weekend. After the kickoff event, I spent the drive home brainstorming with Barry (and some really wild ideas got tossed around at that stage), so that by the time I’d arrived at our “base of operations,” we already had a good handle on the story, and Pam and I could begin working out casting and logistics (including borrowing a neighbor’s beat-up old car — as Pam says, the “third star” of our movie). It was still a late night, but we were in great shape to start shooting first thing Saturday morning.

Saturday was (as usual) a loooong day, but we managed to remain pretty flexible. We did have to switch the timing for one location (which meant we lost an actress for that scene and had to recast at the last minute), but we still managed to finish everything by around midnight. And we got some really great performances — and shots — in the process. Then it was time to get the overnight editor (Jacob Cremer, back in town for the weekend) set up and grab a couple of hours’ rest before the big scramble on Sunday.

We did run into a few snags at that point. We weren’t able to get in touch with the artist whose music we’d originally wanted to use (he was out of town without phone or email access), so that was out. (Fortunately, the 48 Hour Film Project organizers had worked out a music licensing deal that gave us a few options.) Jacob wasn’t able to get as far as I’d hoped (we had a lot of material there), which meant I still had to string out a lot of footage before I could start polishing anything. And our initial cut — once we reached that stage — came in at more than nine minutes. The upper limit being seven. Whoops.

So as unfortunately happens at that stage, you make tradeoffs. And in our case, that meant sacrificing color and audio correction for really taking the time to look at the piece and make intelligent cuts. So while it may not be as technically polished as I’d like, it’s a lot more creatively rewarding. And that “second choice” music really ended up complementing the story perfectly.

And most importantly, we got it finished. (Just one copy, though — no time for a backup.)

Oh, and the title? “All Roads Lead Away.”

Will there be a “director’s cut”? Probably — but that’ll mostly be just to correct those technical issues. The old mantra about editing holds true — the forced necessity of cutting it down really does improve the flow of the story. So while I may add a couple of shots (and maybe one scene) back in, it certainly won’t be going back up to that nine-minute version.

Now I can’t wait to see it up on the big screen; it promises to be a great capper to the whole experience. (And for the record, I’ve also gotten a sneak peek at the Integral Arts entry — so I can say that attendees at tonight’s 9:30 screening will not be disappointed. Do you have your tickets yet?)

Hope to see you all there!

Monday, May 05, 2008

“All Roads Lead Away”

I’m still tired from the 48 Hour Film Project, and I wasn’t even that involved in yesterday’s work. The experience of making a film in two days is so intense that it takes a lot out of you. Our script by Barry Lyga was ambitious, and our filming went from our Saturday 8:30 a.m. call time until almost midnight. It was a very long day for the crew and our two lead actors, who really carried the piece. Well, three lead actors if you include the beat-up car which we considered the third star of the movie.

Barry gave us an amazing script, dramatic and contemplative. Bill and I selected two strong actors (Jennifer Massey and Joe Hansard) who could pull off the emotion of the film. We got to test the new camera car mount, to the delight of the cameraman. I kept asking for reassurance that the expensive camera was not, was NOT, going to fall off the hood of the car. After a last-minute location change, I was slotted for a small part in the movie — which ended up on the cutting room floor in the interest of meeting our seven-minute running time requirement. I’m still in the background helping a customer, and my hair is in a later office scene. Oh, the glamour.

Bill spent Sunday editing the film at his workplace, while I searched for music at home. I found the piece that we ended up using within a few minutes. Unfortunately, I then spent almost two hours continuing to search for music, finding almost nothing, and deciding to stick with my first choice. After Bill was forced to make some difficult decisions about editing, he sent me the film online so I could look at it. With my fresh perspective — having not spent the last six hours putting it together — I was able to suggest different places to cut, allowing some great moments to fit back in (though not my scene, alas). For later festivals, we may look at putting in a lost scene where the couple fights outside the car. It was a crew favorite as Jennifer screamed, “GET IN THE CAR!!!” with pure fury.

Our screening is Friday at 9:30 at the AFI Silver Theatre in Bethesda, Maryland. We’re really proud of it, and I can’t wait to see it on the big screen. If you’re in the area, you can order tickets online — but do so soon, because the shows always sell out. If you can’t get to the show, the film — “All Roads Lead Away” — will be available on our website sometime after the screening.

Friday, May 02, 2008

The Adventure Continues

One last message to everyone before we bury ourselves in this weekend’s filmmaking frenzy. Tickets to our 48 Hour Film Project screening — we’re part of Group H, showing next Friday, May 9, at 9:30 pm — are now on sale online or at the AFI Silver Theater box office. The show is expected to sell out, so if you’d like to attend (and for the record, I’d like to see as many friendly faces in the audience as possible), be sure to pick up your tickets sooner rather than later.

And as an aside, I’ve recut the trailer for “Number One With a Bullet” slightly — mostly just adding in a few extra shots to help explain the plot a bit better. (It’s amazing what another eight seconds can do.) Go ahead and give it a look-see.

P.S.: If you’re on this weekend’s production team, expect to hear from us with more info tonight. And if you want to be on the team and haven’t said so before now... well, talk fast.

Saturday, April 26, 2008

Less Than One Week to Go!

In the frenzy of activity surrounding the finish of principal photography on “Number One With a Bullet,” it’s easy to forget that we’re shooting another movie in just one week. And at this stage, we’ve still got some pretty big holes to fill. So I’ll keep this message short (for me, anyway) and to the point.

We still need actors; a lot of our regular troupe will be unavailable this time around. As always, we can’t promise anything (since we won’t know what we’ll have until we write our script Friday evening), but if you’ll be available, please let me know — and if you’ve got any questions, please ask. Soon.

We need locations; I haven’t had time to do all the legwork I usually try to do beforehand here. At a minimum, we could use a house and/or apartment, an office, and some kind of recreational location (cafe, bar, restaurant, lounge, etc.). We’ll be shooting (mostly) across Saturday, so if you’ve got access to such a place, or have any contacts who can help us reserve some of these places, please let me know ASAP.

And we could still use some help on the editorial end, if only to alleviate some of my own impending exhaustion. Any availability overnight Saturday or during the day Sunday would be a big help.

Okay, that’s it for now. But as a special reward for listening, I’ll direct you to the brand-new trailer for “Number One With a Bullet,” now available for online viewing at www.onewithabullet.com. Okay, so it’s not the full movie, but we’ve still got a lot of work to do before that’s ready. Enjoy!

Thursday, April 17, 2008

Not Slowing Down

I wanted to let everyone know that we officially wrapped principal photography on “Number One With a Bullet” this past weekend. And I’m only now starting to get back up to fighting strength. Which is a good thing — since we’re only two weeks away from this year’s 48 Hour Film Project. (I don’t know what I was thinking with this back-to-back scheduling.)

The shoot was intense, but hugely successful. We had the usual bumps along the way (not to mention more than our share of unusual bumps), but the whole team was running on all cylinders, both in front of and behind the camera. I’ve been looking at the footage, and some of it is absolutely amazing. Performances, look, sound, everything. My enthusiasm for this project has been wholeheartedly rekindled. I’m scrambling to cut together a full trailer for the film, so that we’ll have at least something to show everyone who put in so many long hours bringing this little idea to fruition. I’ll send out a note when it’s up for viewing, but just in case, be sure to check out the official site, onewithabullet.com, for updates. And then we’ll be diving full-on into the editing and postproduction process; there’s still a lot of work to do, but we’re definitely on track.

Which brings me to our second item on the agenda — putting together our team for this year’s 48 Hour Film Project, taking place over the weekend of May 2–4. We’re losing quite a few of our regular contingent this time around, so we do find ourselves in need of participants, especially in the editorial arena. So if you want to pitch in, drop me a line — and if we can use you, we’ll make sure to put you on the roster. (In keeping with our largely accidental tradition of never keeping the same writer twice, we’ve managed to ensnare... I mean, acquire the services of novelist Barry Lyga, author of The Astonishing Adventures of Fanboy and Goth Girl and Boy Toy, so I want to make sure we can all live up to that standard.)

Of course, I may not be answering my email right away, since I’m on my way to Disney World with the family for a few days — I figured we could all use some quality time together after I effectively abandoned them for the past month. But I’ll be back next week, ready to go!

Or at least that’s what I’m telling myself.

Thursday, April 03, 2008

Lock and Load

Well, folks, we’re now less than 48 hours away from the commencement of lensing on “Number One With a Bullet,” so it seems like an opportune time for a news-blog update. It feels like I haven’t slept in two weeks, and it certainly doesn’t look like I’ll be getting any real rack time for the next couple of weeks either. I never thought I’d be one to espouse the “I’ll sleep when I’m dead” philosophy (I like sleep — sleep is good), but lately it seems like I’m getting closer to that.

Of course, it looks like the big items (at least for the first weekend) are all in order. SAG paperwork, insurance, equipment, locations, shooting schedule... but it’s the nagging little details that seem to eat up most of my attention right now. Like, say, food. (Seriously — if anyone wants to handle making sure people are fed, please let me know ASAP. I’ll even send you a shopping list.)

And then there’s the stress of realizing that we’ve set ourselves a schedule that’ll make the 48 Hour Film Project look like a walk in the park.

But on the plus side, I have to admit that a big part of my insomnia is caused by my sheer excitement at the prospect of tackling a project this big. Sure, it’s still a short, but it’s twice the length of anything we’ve done before, and the production effort we’re putting forth dwarfs that of any of our past projects. I’m happy with the script, inspired by the crew, ecstatic about the cast, and relishing the adrenaline rush that comes with stretching our capabilities just beyond where I would have placed the breaking point only a few short months ago.

This past year has been a positive whirlwind of learning, and I think it’s only by forcing us to make the leap that we’ll really see if we’re ready to advance to the next level.

For those of you helping out with the production, I’ll be seeing you this weekend. For those eager to jump in on the 48 Hour Film Project (May 2-4), drop me a line (but please understand I may not respond in all that timely a manner). And for those who just want to watch and enjoy, I’m optimistic that we’ll have something truly worth your while in the very near future.

Friday, March 14, 2008

“Number One With a Bullet” Update

Well, things are moving quickly. Casting is complete, and we’ve got a phenomenal bunch of people on board! We had somewhere in the neighborhood of 250 submissions, and saw close to 120 different actors. The selection process was brutal — we had so many great candidates — but in the end, I think we’ve made the best choices for our little ensemble. Kudos to Bjorn Munson for organizing our casting, and thanks to Barry Gribble for letting us use the Integral Arts offices. And a special thanks to all the actors who came out and gave it a shot. I was truly humbled by the efforts you all put forth, and hope to see you again for future projects.

Preproduction is proceeding apace; with just three weeks to go before the cameras roll, we’re right about on schedule. And while I’d be lying if I said I wasn’t stressing just a bit (okay, more than a bit), I’m also getting more and more excited as the day grows closer. In fact, I’ve gone ahead and cut together a little “teaser trailer” that I’m hoping will get people psyched for the big shoot. You can view it at the film’s official website — onewithabullet.com — or via YouTube or MySpace as well. It really is just a teaser (since we obviously haven’t shot a frame yet), but I’m hoping it at least sets the stage for our little venture.

We’re still locking down some locations, so if anyone has any leads (preferably in or very near the city), please let me know as soon as possible; while we’ve got our main location (the office) all set, we still need a large house exterior and driveway, a walk-in-freezer (or wine cellar), and a well-apportioned study. And we’re also in the process of filling out our crew roster; if you want to join in, drop me a line ASAP.

And as if that weren’t enough, we’re also signed up for the 48 Hour Film Project, scheduled for the first weekend in May. So if you want to help out there, be sure to let me know as well.

Okay, enough talk. Go watch the trailer and have a nice weekend!